Demolition

Statics on sandy terrain

Hagedorn secures demolition work in a listed neighbourhood on the island of Norderney
The Hagedorn Group controls vibrations and shocks with new special measuring instruments. Project managers are notified immediately if threshold values are exceeded.
On the island of Norderney many houses…

> continue reading

“Courage to change, courage to innovate!”

The FACHTAGUNG ABBRUCH with record attendance
Europe’s largest industry event awards prizes for innovations in recycling of construction materials
More than 1,100 participants, 127 exhibitors and over 1,000 square metres of exhibition space:
The FACHTAGUNG ABBRUCH 2020 at the end of February in Berlin showed once again why it is the most important annual event in the industry….

> continue reading

Max Wild dismantles bridge with “Litzentechnik”

746 tons of stroke at the crossover of the valley at the river Neckar in Heilbronn
In the course of the ÖPP project “availability model A6“, the “experts without borders“ perform the dismantling of the crossover of the valley at the river Neckar between the connecting points Heilbronn/Neckarsulm and Heilbronn/Untereisesheim by order of the BAUARGE A6 West….

> continue reading

Demolition of the biggest high-rise building in Europe – engineering performance meets urban mining

In December of 2014 after months of negotiations the BST Becker Sanierungstechnik GmbH has been charged with the demolition of the three towers of the former Deutsche Welle in Cologne.
Since in the course of dismantling these three towers (elevator, studio and office tower) that are built in steel skeleton structure an extensive asbestos decontamination also needed to be done, the actual dismantling of these high-rise buildings can only start now….

> continue reading

City centre Muenster: Dismantling in precision work and record time

For real experts – Narrow alleys and listed buildings require finesse.
When the construction machines can comfortably drive up, enough space for manoeuvring is available and the entrances and departures are freely available, the conditions for complex dismantling works are perfect. In practice that often stays a wishful thinking as well as the conditions for demolition projects present challenges….

> continue reading

Use of special grinding process

Pollutant decontamination in the middle of spa city Baden-BadenThe Oettinger group dismantled the former residential building for French military personnel in Baden-Baden.
A special grinding process has been used for the dismantling of the former soldier´s apartments in Baden-Baden. As these have been burdened with pollutants. In the 1950´s building sections with several floors have been built as residential buildings for French military personnel in Baden-Baden….

> continue reading

Special demolition at the airport

Dismantling under confined space conditions
In the end the compliance of a narrow time frame was only possible because of a special demolition concept.
The dismantling of an overall 70 m long section of the old airport´s tunnel in Frankfurt a.M. posed a special challenge for the from the Fa. Wayss & Freytag Ingenierbau AG instructed Robert Zeller GmbH & Co. KG (i.F. Fa. Zeller) from Offenbach….

> continue reading

FACHTAGUNG ABBRUCH 2020 on the 28th of February 2020 in Berlin

The annual meeting of the European demolition industry at STATION-Berlin
Ranga Yogeshwar, science journalist and physicist will present the keynote – top-class specialist speakers provide information on current specialist topics relating to demolition – accompanying trade exhibition with a wide range of products…

> continue reading