{"id":49302,"date":"2024-06-24T10:12:31","date_gmt":"2024-06-24T08:12:31","guid":{"rendered":"https:\/\/www.deutscher-abbruchverband.de\/?p=49302"},"modified":"2024-06-24T10:12:31","modified_gmt":"2024-06-24T08:12:31","slug":"construction-site-of-the-week-demolition-of-a-bell-tower","status":"publish","type":"post","link":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/","title":{"rendered":"Construction site of the week &#8211; Demolition of a bell tower"},"content":{"rendered":"<p>Instead of bells ringing, construction site noises have been heard in D\u00fcsseldorf&#8217;s S\u00fcdallee since mid-May. Here, DA member company Vennes Erd- &amp; Tiefbau Abbruch is demolishing a 37-metre-high bell tower from 1966.<\/p>\n<p>An 86 t Hitachi tracked excavator (KMC 600 P-7), two Hitachi ZX350s and a heavy-duty crane holding a protective mat are being used on the 5,000 square meter demolition site. The reinforced concrete structure with masonry infills is cut down and removed in a controlled manner using demolition shears.<\/p>\n<p>The work is accompanied by intensive watering to bind the dust as effectively as possible. There is a day nursery and a shopping area next to the construction site. The surrounding roads have been closed to prevent any danger to passers-by or passing cars.<\/p>\n<p>Parallel to the dismantling of the tower, two building complexes on the site will be demolished, processed and disposed of professionally.<\/p>\n<p>The project will continue until mid-July 2024. New apartments are to be built on the resulting site.<\/p>\n<p>You can find more photos on our\u00a0<a href=\"https:\/\/www.instagram.com\/p\/C8eTqTZozGu\/\" target=\"_blank\" rel=\"noopener\"><strong>Instagram<\/strong><\/a>\u00a0and\u00a0<a href=\"https:\/\/www.facebook.com\/permalink.php?story_fbid=pfbid02oh2QLWrbnQUEjXA4XANLAGLSGuHCBwWBeaTsvC87o9nvAmtEdNiGMJBgKaBdyrNZl&amp;id=100063562450992\" target=\"_blank\" rel=\"noopener\"><strong>Facebook<\/strong>\u00a0<\/a>channel.<\/p>\n<p>Photos: Vennes Erd- &amp; Tiefbau Abbruch<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Instead of bells ringing, construction site noises have been heard in D\u00fcsseldorf&#8217;s S\u00fcdallee. Vennes Erd- &#038; Tiefbau Abbruch is demolishing a 37-metre-high bell tower&#8230;.<\/p>\n","protected":false},"author":751,"featured_media":49304,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_total_topic_count_hidden":0,"_bbp_total_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[3677],"tags":[],"class_list":["post-49302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-member-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction site of the week - Demolition of a bell tower - Deutscher Abbruchverband e.V.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction site of the week - Demolition of a bell tower - Deutscher Abbruchverband e.V.\" \/>\n<meta property=\"og:description\" content=\"Instead of bells ringing, construction site noises have been heard in D\u00fcsseldorf&#039;s S\u00fcdallee. Vennes Erd- &amp; Tiefbau Abbruch is demolishing a 37-metre-high bell tower....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/\" \/>\n<meta property=\"og:site_name\" content=\"Deutscher Abbruchverband e.V.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pg\/Deutscher-Abbruchverband-eV-163906820357873\/about\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-24T08:12:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/06\/Baustelle-der-Woche_Bild-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Viola Ridderbusch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Viola Ridderbusch\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/\"},\"author\":{\"name\":\"Viola Ridderbusch\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/1d7a05b68196589df6545a48a6d6b9ea\"},\"headline\":\"Construction site of the week &#8211; Demolition of a bell tower\",\"datePublished\":\"2024-06-24T08:12:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/\"},\"wordCount\":190,\"image\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Baustelle-der-Woche_Bild-1-1.jpg\",\"articleSection\":[\"Member news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/\",\"name\":\"Construction site of the week - Demolition of a bell tower - Deutscher Abbruchverband e.V.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Baustelle-der-Woche_Bild-1-1.jpg\",\"datePublished\":\"2024-06-24T08:12:31+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/1d7a05b68196589df6545a48a6d6b9ea\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Baustelle-der-Woche_Bild-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Baustelle-der-Woche_Bild-1-1.jpg\",\"width\":1080,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/06\\\/construction-site-of-the-week-demolition-of-a-bell-tower\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction site of the week - Demolition of a bell tower\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#website\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/\",\"name\":\"Deutscher Abbruchverband e.V.\",\"description\":\"Oberl\u00e4nder Ufer 180 - 182  50968 K\u00f6ln\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/1d7a05b68196589df6545a48a6d6b9ea\",\"name\":\"Viola Ridderbusch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/751\\\/1669885832-bpthumb.jpg\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/751\\\/1669885832-bpthumb.jpg\",\"contentUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/751\\\/1669885832-bpthumb.jpg\",\"caption\":\"Viola Ridderbusch\"},\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/author\\\/viola-ridderbusch\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction site of the week - Demolition of a bell tower - Deutscher Abbruchverband e.V.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/","og_locale":"en_US","og_type":"article","og_title":"Construction site of the week - Demolition of a bell tower - Deutscher Abbruchverband e.V.","og_description":"Instead of bells ringing, construction site noises have been heard in D\u00fcsseldorf's S\u00fcdallee. Vennes Erd- & Tiefbau Abbruch is demolishing a 37-metre-high bell tower....","og_url":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/","og_site_name":"Deutscher Abbruchverband e.V.","article_publisher":"https:\/\/www.facebook.com\/pg\/Deutscher-Abbruchverband-eV-163906820357873\/about\/","article_published_time":"2024-06-24T08:12:31+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/06\/Baustelle-der-Woche_Bild-1-1.jpg","type":"image\/jpeg"}],"author":"Viola Ridderbusch","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Viola Ridderbusch","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#article","isPartOf":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/"},"author":{"name":"Viola Ridderbusch","@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/1d7a05b68196589df6545a48a6d6b9ea"},"headline":"Construction site of the week &#8211; Demolition of a bell tower","datePublished":"2024-06-24T08:12:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/"},"wordCount":190,"image":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/06\/Baustelle-der-Woche_Bild-1-1.jpg","articleSection":["Member news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/","url":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/","name":"Construction site of the week - Demolition of a bell tower - Deutscher Abbruchverband e.V.","isPartOf":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#primaryimage"},"image":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/06\/Baustelle-der-Woche_Bild-1-1.jpg","datePublished":"2024-06-24T08:12:31+00:00","author":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/1d7a05b68196589df6545a48a6d6b9ea"},"breadcrumb":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#primaryimage","url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/06\/Baustelle-der-Woche_Bild-1-1.jpg","contentUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/06\/Baustelle-der-Woche_Bild-1-1.jpg","width":1080,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/06\/construction-site-of-the-week-demolition-of-a-bell-tower\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deutscher-abbruchverband.de\/en\/"},{"@type":"ListItem","position":2,"name":"Construction site of the week - Demolition of a bell tower"}]},{"@type":"WebSite","@id":"https:\/\/www.deutscher-abbruchverband.de\/#website","url":"https:\/\/www.deutscher-abbruchverband.de\/","name":"Deutscher Abbruchverband e.V.","description":"Oberl\u00e4nder Ufer 180 - 182  50968 K\u00f6ln","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deutscher-abbruchverband.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/1d7a05b68196589df6545a48a6d6b9ea","name":"Viola Ridderbusch","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/751\/1669885832-bpthumb.jpg","url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/751\/1669885832-bpthumb.jpg","contentUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/751\/1669885832-bpthumb.jpg","caption":"Viola Ridderbusch"},"url":"https:\/\/www.deutscher-abbruchverband.de\/en\/author\/viola-ridderbusch\/"}]}},"_links":{"self":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/49302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/users\/751"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/comments?post=49302"}],"version-history":[{"count":3,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/49302\/revisions"}],"predecessor-version":[{"id":49341,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/49302\/revisions\/49341"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/media\/49304"}],"wp:attachment":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/media?parent=49302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/categories?post=49302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/tags?post=49302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}