{"id":51851,"date":"2024-11-15T13:01:43","date_gmt":"2024-11-15T12:01:43","guid":{"rendered":"https:\/\/www.deutscher-abbruchverband.de\/?p=51851"},"modified":"2024-11-22T10:34:24","modified_gmt":"2024-11-22T09:34:24","slug":"construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage","status":"publish","type":"post","link":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/","title":{"rendered":"Construction site of the week &#8211; Partial demolition of a P+R parking garage"},"content":{"rendered":"<p>In Filderstadt in the German state of Baden-W\u00fcrttemberg, the partial demolition of a P+R parking garage is currently being carried out by DA member company GL-Abbruch GmbH. The lower floors and the ground floor (parking level 0), the access ramps and the upper parking level P1 (1st floor), which serves as a temporary roof, are to remain in place for interim use. Due to static deficiencies, the demolition is carried out floor by floor. In this process, individual concrete parts are successively cut out and lifted off using concrete cutting technology. The lifting is carried out with a high-rise crane. For this purpose, core holes are drilled in some cases as attachment points for the respective concrete part. Another part of the concrete parts is fixed to the high-rise crane using a \u201cspecial fork\u201d and lifted off. The procedure is identical for each floor and is carried out strictly according to the schedule. A total of approx. 650 ceiling parts are lifted.<\/p>\n<p>The steel girder frame construction is being dismantled step by step as construction progresses. The statically irrelevant longitudinal sections of the individual parking levels are carried out in advance. The current work areas are supported by means of PERI PEP 20-350 frame construction until the lift. The support is carried out piece by piece according to the schedule and construction progress. The separation of the wall slab from the existing building is also carried out floor by floor using concrete cutting technology and core drilling for fixing the concrete parts to the high-rise crane.<\/p>\n<p>The removed concrete parts were partly used by a third-party contractor for the further development of his storage area and partly used for the production of RC concrete products.<\/p>\n<p>You can find more photos on our<strong>\u00a0<a href=\"https:\/\/www.instagram.com\/p\/DCZrtDuB5ha\/?img_index=1\" target=\"_blank\" rel=\"noopener\">Instagram<\/a><\/strong>\u00a0and\u00a0<strong><a href=\"https:\/\/www.facebook.com\/permalink.php?story_fbid=pfbid026PFwxWddVK53Gfz1fwnHsJihPzfUdFz66d1jLTMdEJCpGp93PGsnUnad2GaMva3Ul&amp;id=100063562450992\" target=\"_blank\" rel=\"noopener\">Facebook<\/a><\/strong>\u00a0channel.<\/p>\n<p>Photos: GL-Abbruch GmbH<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Baden-W\u00fcrttemberg, DA member company GL-Abbruch used concrete cutting technology to partially dismantle a structurally deficient P+R parking garage. 650 ceiling panels were lifted off using a high-rise crane&#8230;.<\/p>\n","protected":false},"author":2495,"featured_media":51847,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[3677],"tags":[4613],"class_list":["post-51851","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-member-news","tag-construction-site-of-the-week"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction site of the week - Partial demolition of a P+R parking garage - Deutscher Abbruchverband e.V.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction site of the week - Partial demolition of a P+R parking garage - Deutscher Abbruchverband e.V.\" \/>\n<meta property=\"og:description\" content=\"In Baden-W\u00fcrttemberg, DA member company GL-Abbruch used concrete cutting technology to partially dismantle a structurally deficient P+R parking garage. 650 ceiling panels were lifted off using a high-rise crane....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/\" \/>\n<meta property=\"og:site_name\" content=\"Deutscher Abbruchverband e.V.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pg\/Deutscher-Abbruchverband-eV-163906820357873\/about\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-15T12:01:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-22T09:34:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/11\/26.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Franziska Klein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Franziska Klein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/\"},\"author\":{\"name\":\"Franziska Klein\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/04662ae71e3ce6819088d7eb06b74001\"},\"headline\":\"Construction site of the week &#8211; Partial demolition of a P+R parking garage\",\"datePublished\":\"2024-11-15T12:01:43+00:00\",\"dateModified\":\"2024-11-22T09:34:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/\"},\"wordCount\":313,\"image\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/26.jpg\",\"keywords\":[\"construction site of the week\"],\"articleSection\":[\"Member news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/\",\"name\":\"Construction site of the week - Partial demolition of a P+R parking garage - Deutscher Abbruchverband e.V.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/26.jpg\",\"datePublished\":\"2024-11-15T12:01:43+00:00\",\"dateModified\":\"2024-11-22T09:34:24+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/04662ae71e3ce6819088d7eb06b74001\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/26.jpg\",\"contentUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/26.jpg\",\"width\":1080,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2024\\\/11\\\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction site of the week &#8211; Partial demolition of a P+R parking garage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#website\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/\",\"name\":\"Deutscher Abbruchverband e.V.\",\"description\":\"Oberl\u00e4nder Ufer 180 - 182  50968 K\u00f6ln\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/04662ae71e3ce6819088d7eb06b74001\",\"name\":\"Franziska Klein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/2495\\\/1710163232-bpthumb.jpg\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/2495\\\/1710163232-bpthumb.jpg\",\"contentUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/2495\\\/1710163232-bpthumb.jpg\",\"caption\":\"Franziska Klein\"},\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/author\\\/kleindeutscher-abbruchverband-de\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction site of the week - Partial demolition of a P+R parking garage - Deutscher Abbruchverband e.V.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/","og_locale":"en_US","og_type":"article","og_title":"Construction site of the week - Partial demolition of a P+R parking garage - Deutscher Abbruchverband e.V.","og_description":"In Baden-W\u00fcrttemberg, DA member company GL-Abbruch used concrete cutting technology to partially dismantle a structurally deficient P+R parking garage. 650 ceiling panels were lifted off using a high-rise crane....","og_url":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/","og_site_name":"Deutscher Abbruchverband e.V.","article_publisher":"https:\/\/www.facebook.com\/pg\/Deutscher-Abbruchverband-eV-163906820357873\/about\/","article_published_time":"2024-11-15T12:01:43+00:00","article_modified_time":"2024-11-22T09:34:24+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/11\/26.jpg","type":"image\/jpeg"}],"author":"Franziska Klein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Franziska Klein","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#article","isPartOf":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/"},"author":{"name":"Franziska Klein","@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/04662ae71e3ce6819088d7eb06b74001"},"headline":"Construction site of the week &#8211; Partial demolition of a P+R parking garage","datePublished":"2024-11-15T12:01:43+00:00","dateModified":"2024-11-22T09:34:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/"},"wordCount":313,"image":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/11\/26.jpg","keywords":["construction site of the week"],"articleSection":["Member news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/","url":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/","name":"Construction site of the week - Partial demolition of a P+R parking garage - Deutscher Abbruchverband e.V.","isPartOf":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#primaryimage"},"image":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/11\/26.jpg","datePublished":"2024-11-15T12:01:43+00:00","dateModified":"2024-11-22T09:34:24+00:00","author":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/04662ae71e3ce6819088d7eb06b74001"},"breadcrumb":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#primaryimage","url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/11\/26.jpg","contentUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2024\/11\/26.jpg","width":1080,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2024\/11\/construction-site-of-the-week-partial-demolition-of-a-pr-parking-garage\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deutscher-abbruchverband.de\/en\/"},{"@type":"ListItem","position":2,"name":"Construction site of the week &#8211; Partial demolition of a P+R parking garage"}]},{"@type":"WebSite","@id":"https:\/\/www.deutscher-abbruchverband.de\/#website","url":"https:\/\/www.deutscher-abbruchverband.de\/","name":"Deutscher Abbruchverband e.V.","description":"Oberl\u00e4nder Ufer 180 - 182  50968 K\u00f6ln","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deutscher-abbruchverband.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/04662ae71e3ce6819088d7eb06b74001","name":"Franziska Klein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/2495\/1710163232-bpthumb.jpg","url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/2495\/1710163232-bpthumb.jpg","contentUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/2495\/1710163232-bpthumb.jpg","caption":"Franziska Klein"},"url":"https:\/\/www.deutscher-abbruchverband.de\/en\/author\/kleindeutscher-abbruchverband-de\/"}]}},"_links":{"self":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/51851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/users\/2495"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/comments?post=51851"}],"version-history":[{"count":4,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/51851\/revisions"}],"predecessor-version":[{"id":52085,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/51851\/revisions\/52085"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/media\/51847"}],"wp:attachment":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/media?parent=51851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/categories?post=51851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/tags?post=51851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}