{"id":54041,"date":"2025-04-04T14:35:17","date_gmt":"2025-04-04T12:35:17","guid":{"rendered":"https:\/\/www.deutscher-abbruchverband.de\/?p=54041"},"modified":"2025-04-04T14:35:17","modified_gmt":"2025-04-04T12:35:17","slug":"construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg","status":"publish","type":"post","link":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/","title":{"rendered":"Construction site of the week &#8211; Demolition of bridge towers in Oldenburg"},"content":{"rendered":"<p>DA member company Scheele Erdbau faced a special challenge at the beginning of the year. The four unused towers of the former C\u00e4cilienbr\u00fccke bridge in Oldenburg were to be demolished. The listed lift bridge had already been removed from service in 2020 and taken away for restoration. With the dismantling of the remaining towers, space has now been made for a new building.<\/p>\n<p><strong>Transporting materials by water<\/strong><\/p>\n<p>The soil investigations in the River Hunte were already underway so that the go-ahead could be given on time in January. The logistics had to be planned with particular precision in the run-up to the project. The approximately 1,000 tonnes of material to be removed had to be transported by water in order to keep the adjacent road clear for traffic. In order to manage the removal via the Hunte, the company hired a freighter that could hold up to 200 tonnes of rubble. This brought the material in containers to a turning point in Oldenburg harbour. Here it was loaded onto lorries and taken to the company headquarters in Wildeshausen for processing.<\/p>\n<p><strong>Scheduled completion of the work<\/strong><\/p>\n<p>The conventional dismantling of the towers was to be completed within seven weeks. In addition to the large quantities of material, around twelve tonnes of hazardous materials, such as asbestos and lead, also had to be professionally removed and disposed of. An excavator (Hitachi KTEG KMC 400P-7) was used on land to load the material into containers on the freighter. A demolition curtain held by a crane was used to prevent material from entering the river. The work was completed on schedule in March.<\/p>\n<p>According to the client, the Weser-Jade-Nordsee Waterways and Shipping Authority (WSA), the C\u00e4cilienbr\u00fccke had to be dismantled due to extensive structural damage, as it was no longer possible to repair it. The construction of a new lift bridge at the same location is currently being planned.<\/p>\n<p>You can find more photos on our\u00a0<strong><a href=\"https:\/\/www.instagram.com\/deutscher_abbruchverband\/\" target=\"_blank\" rel=\"noopener\">Instagram<\/a><\/strong>\u00a0and\u00a0<strong><a href=\"https:\/\/www.facebook.com\/profile.php?id=100063562450992\" target=\"_blank\" rel=\"noopener\">Facebook<\/a><\/strong>\u00a0channel.<\/p>\n<p>You can find a video of the project on <strong><a href=\"https:\/\/youtu.be\/cJJx-yloFd4?si=b5kNqw3DEJ_Cc29t\" target=\"_blank\" rel=\"noopener\">YouTube<\/a><\/strong>.<\/p>\n<p>Pictures: Scheele Erdbau GmbH &amp; Co. KG<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Oldenburg, four towers of a former lift bridge were demolished. The logistics of the project were planned precisely in advance. The material was to be transported away by water&#8230;.<\/p>\n","protected":false},"author":2495,"featured_media":54040,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[3677],"tags":[4613],"class_list":["post-54041","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-member-news","tag-construction-site-of-the-week"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction site of the week - Demolition of bridge towers in Oldenburg - Deutscher Abbruchverband e.V.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction site of the week - Demolition of bridge towers in Oldenburg - Deutscher Abbruchverband e.V.\" \/>\n<meta property=\"og:description\" content=\"In Oldenburg, four towers of a former lift bridge were demolished. The logistics of the project were planned precisely in advance. The material was to be transported away by water....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/\" \/>\n<meta property=\"og:site_name\" content=\"Deutscher Abbruchverband e.V.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pg\/Deutscher-Abbruchverband-eV-163906820357873\/about\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-04T12:35:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2025\/04\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Franziska Klein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Franziska Klein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/\"},\"author\":{\"name\":\"Franziska Klein\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/04662ae71e3ce6819088d7eb06b74001\"},\"headline\":\"Construction site of the week &#8211; Demolition of bridge towers in Oldenburg\",\"datePublished\":\"2025-04-04T12:35:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/\"},\"wordCount\":356,\"image\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg\",\"keywords\":[\"construction site of the week\"],\"articleSection\":[\"Member news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/\",\"name\":\"Construction site of the week - Demolition of bridge towers in Oldenburg - Deutscher Abbruchverband e.V.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg\",\"datePublished\":\"2025-04-04T12:35:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/04662ae71e3ce6819088d7eb06b74001\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg\",\"contentUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/2025\\\/04\\\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction site of the week &#8211; Demolition of bridge towers in Oldenburg\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#website\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/\",\"name\":\"Deutscher Abbruchverband e.V.\",\"description\":\"Oberl\u00e4nder Ufer 180 - 182  50968 K\u00f6ln\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/#\\\/schema\\\/person\\\/04662ae71e3ce6819088d7eb06b74001\",\"name\":\"Franziska Klein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/2495\\\/1710163232-bpthumb.jpg\",\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/2495\\\/1710163232-bpthumb.jpg\",\"contentUrl\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/wp-content\\\/uploads\\\/avatars\\\/2495\\\/1710163232-bpthumb.jpg\",\"caption\":\"Franziska Klein\"},\"url\":\"https:\\\/\\\/www.deutscher-abbruchverband.de\\\/en\\\/author\\\/kleindeutscher-abbruchverband-de\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction site of the week - Demolition of bridge towers in Oldenburg - Deutscher Abbruchverband e.V.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/","og_locale":"en_US","og_type":"article","og_title":"Construction site of the week - Demolition of bridge towers in Oldenburg - Deutscher Abbruchverband e.V.","og_description":"In Oldenburg, four towers of a former lift bridge were demolished. The logistics of the project were planned precisely in advance. The material was to be transported away by water....","og_url":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/","og_site_name":"Deutscher Abbruchverband e.V.","article_publisher":"https:\/\/www.facebook.com\/pg\/Deutscher-Abbruchverband-eV-163906820357873\/about\/","article_published_time":"2025-04-04T12:35:17+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2025\/04\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg","type":"image\/jpeg"}],"author":"Franziska Klein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Franziska Klein","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#article","isPartOf":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/"},"author":{"name":"Franziska Klein","@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/04662ae71e3ce6819088d7eb06b74001"},"headline":"Construction site of the week &#8211; Demolition of bridge towers in Oldenburg","datePublished":"2025-04-04T12:35:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/"},"wordCount":356,"image":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2025\/04\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg","keywords":["construction site of the week"],"articleSection":["Member news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/","url":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/","name":"Construction site of the week - Demolition of bridge towers in Oldenburg - Deutscher Abbruchverband e.V.","isPartOf":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#primaryimage"},"image":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2025\/04\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg","datePublished":"2025-04-04T12:35:17+00:00","author":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/04662ae71e3ce6819088d7eb06b74001"},"breadcrumb":{"@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#primaryimage","url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2025\/04\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg","contentUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/2025\/04\/Bild-Baustelle-der-Woche_Scheele-Erdbau_Webseite-.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/www.deutscher-abbruchverband.de\/en\/2025\/04\/construction-site-of-the-week-demolition-of-bridge-towers-in-oldenburg\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deutscher-abbruchverband.de\/en\/"},{"@type":"ListItem","position":2,"name":"Construction site of the week &#8211; Demolition of bridge towers in Oldenburg"}]},{"@type":"WebSite","@id":"https:\/\/www.deutscher-abbruchverband.de\/#website","url":"https:\/\/www.deutscher-abbruchverband.de\/","name":"Deutscher Abbruchverband e.V.","description":"Oberl\u00e4nder Ufer 180 - 182  50968 K\u00f6ln","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deutscher-abbruchverband.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.deutscher-abbruchverband.de\/#\/schema\/person\/04662ae71e3ce6819088d7eb06b74001","name":"Franziska Klein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/2495\/1710163232-bpthumb.jpg","url":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/2495\/1710163232-bpthumb.jpg","contentUrl":"https:\/\/www.deutscher-abbruchverband.de\/wp-content\/uploads\/avatars\/2495\/1710163232-bpthumb.jpg","caption":"Franziska Klein"},"url":"https:\/\/www.deutscher-abbruchverband.de\/en\/author\/kleindeutscher-abbruchverband-de\/"}]}},"_links":{"self":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/54041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/users\/2495"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/comments?post=54041"}],"version-history":[{"count":1,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/54041\/revisions"}],"predecessor-version":[{"id":54042,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/posts\/54041\/revisions\/54042"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/media\/54040"}],"wp:attachment":[{"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/media?parent=54041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/categories?post=54041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.deutscher-abbruchverband.de\/en\/wp-json\/wp\/v2\/tags?post=54041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}